Building Plans Review

ADOPTED CODES

Codes Currently Being Enforced


  • 2018 International Building Code with Appendices C, E, H, I    
  • 2018 International Fire Code
  • 2018 International Fuel Gas Code
  • 2018 International Mechanical Code
  • 2018 International Plumbing Code
  • 2015 International Residential Code with Appendix G
  • 2017 National Electric Code

Cahaba Valley Fire Requirements

Commercial Plans Review

  1. One paper or one digital set is required (Digital Preferred). The electronic copy can be submitted on a CD in a .pdf format; or they can be sent in .pdf format via email to john.yancey@cahabavalleyfire.org, Fire Marshal.  The plans must include structural, architectural, plumbing, gas, mechanical, and electrical designs. The architectural plans must include a code summary / life safety plan and a scope of work. The architectural plans must be stamped by an architect licensed in the State of Alabama if the project is 2,500 square feet in size or more, if the project is an initial build-out in a building of 2,500 square feet or more, or if the project is an assembly or educational occupancy.
  2.  Paper copies or pdf on CD can be hand delivered or mailed to:

John Yancey

145 Narrows Drive

Birmingham, AL 35242

  1. If you have questions call 205-991-6664 Opt 4
  2. Link to Fire Affidavit  or the fire department can provide one once plans are received.

Shelby County Requirements 

Click here to view Shelby County website

Residential Plans Review

One set will be reviewed and returned to contractor or responsible party at issuance of permit .  This reviewed set must be kept on job site at all times. Plans shall be drawn neat, straight lines, and to scale.  Construction of exterior walls of dwellings and accessory buildings less than 5 feet from property line must be designed using Table R 302.1.  In areas governed by Architectural Review Committees, please contact your ARC for further requirements.

Plans must contain:

  • foundation plan: cross section and overview
  • floor plans
  • roof plan
  • front elevation view
  • rear elevation view
  • side elevation view

Commercial Plans Review

  1. One paper and one digital set is required.  The electronic copy must be submitted on a CD in a .pdf format; or they can be sent in .pdf format via email to Phillip Crunk, Inspection Services Supervisor.  The plans must include structural, architectural, plumbing, gas, mechanical, and electrical designs. The architectural plans must include a code summary / life safety plan and a scope of work. The architectural plans must be stamped by an architect licensed in the State of Alabama if the project is 2,500 square feet in size or more, if the project is an initial build-out in a building of 2,500 square feet or more, or if the project is an assembly or educational occupancy.
  2. The COMcheck compliance certificate submittal is required to verify that the building envelope and the building systems comply with the International Energy Conservation Code.
  3. The electrical plans must be stamped by an electrical engineer licensed in the State of Alabama and must include:
    • An electrical load calculation
    • Short-circuit study
    • Utilization equipment and panelboard schedules
    • Single lines for service, all feeders, separately derived systems, and major equipment branch circuits
    • Grounding electrode system and intersystem bonding requirements
    • Proposed use of the facility
    • Special requirements to comply with Chapters 5, 6, and 7 of NEC
    • Proposed communication systems
    • Verification of compliance with the 2009 IECC energy requirements

Note:

  • A stamped set of plans to be kept on the job site by the contractor or responsible party is required.
  • One set of plans must be delivered with affidavit to the local fire district.
  • The project name is required.
  • A sign permit may be required.

Note: Drawings for fire sprinkler and fire alarm systems, stamped by a professional engineer must be received prior to approval of the systems. 

Contact the Health Department at (205) 685-4178 for any and all work performed on restaurants, limited food services, mobile food services, schools, pools, day cares, or hotels / motels. One set of plans may be required.

 

How to Know If You Need a Building Permit

Any and all new construction projects, along with additions, remodels, renovations, electrical service upgrades, tenant build outs, moved homes, manufactured homes, recreational vehicle connections, plumbing, gas, and mechanical installations, and other projects, are required to purchase a building permit.

Pursuant to the Alabama Energy and Residential Codes (AERC) Board under the Alabama Department of Economic and Community Affairs Rule 305-2-4-.08 “Commercial Energy Code” and 305-2-4-.09, “Residential Building and Energy Code”, Shelby County will begin enforcement of the International Residential Code 2015 Edition and the International Energy Code 2015 Edition with the amendments as promulgated by the AERC Board for all permit applications submitted after January 1, 2017.

Additional information can be found at: http://adeca.alabama.gov/Divisions/energy/energycodes/Pages/default.aspx 

Full text versions of Rule 305-2-4-.08: http://adeca.alabama.gov/Divisions/energy/energycodes/Energy%20Codes/2015%20Alabama%20Commercial%20Energy%20Code.pdf

Full text versions of Rule 305-2-4-.09: http://adeca.alabama.gov/Divisions/energy/energycodes/Energy%20Codes/2015%20Alabama%20Residential%20Energy%20Code.pdf

Construction Industry Training Fee:
Pursuant to State of Alabama Act 2015-308, a fee of one dollar for every one thousand dollars of construction authorized shall apply to any non-residential building permit.

A full text of Act 2015-308 is available on the Secretary of State’s website at http://arc-sos.state.al.us/PAC/SOSACPDF.–1/A0010945.PDF